Master Bathroom
Entry Level
$85K+
-New Fiberglass Tub & Shower Base
-Luxury Vinyl Floor Tiles
-Porcelain Tile or Cultured Stone Shower Walls.
-Tier #1 Vanity Cabinetry
-Tier #1 Plumbing Fixtures
-Tier #1 Quartz/Granite Remnant Countertops
-Framed Shower Door
-Some Electrical Upgrades
-All Fixtures Remain in Same Locations
Mid Level
$105K+
-Remove Existing Tub & Shower. Expand New Shower Footprint (Tub Not Included)
-Porcelain Tile Flooring, Shower Walls & Pan
-Tier #2 Vanity Cabinetry
-Tier #2 Plumbing Fixtures
-Tier #2 Quartz/Granite Countertops
-Some Electrical Upgrades
-Frameless Shower Door
-Limited Fixture Movement
Upper Level
$125K+
-Remove Existing Tub & Shower. Expand New Shower Footprint.
-Install New Tub
-Natural Stone Flooring, Shower Walls, and Pan
-Custom Vanity & Storage Cabinetry
-Tier #3 Plumbing Fixtures
-Tier #3 Quartz/Granite Countertops
-Frameless Shower Door
-Fixtures May Be Relocated
What's Included in Cost
- Labor, Materials, Flooring, Cabinets, Countertops, Paint and Fixtures.
What's Not Included in Cost
- Permits, Code Required Upgrades.
Hall Bathroom
Entry Level
$55K+
-Keep Existing Tub
-Luxury Vinyl Floor Tiles
-3 Piece Acrylic or Cultured Stone Shower Walls.
-Tier #1 Vanity Cabinetry
-Tier #1 Plumbing Fixtures
-Tier #1 Quartz/Granite Remnant Countertops
-No Shower Door
-Some Electrical Upgrades
-All Fixtures Remain in Same Locations
Mid Level
$65K+
-Replace Existing Tub with Fiberglass Tub or Shower Base.
-Porcelain Tile Flooring & Shower Walls
-Tier #2 Vanity Cabinetry
-Tier #2 Plumbing Fixtures
-Tier #2 Quartz/Granite Remnant Countertops
-Some Electrical Upgrades
-Framed Shower Door
-Same Fixture Location
Upper Level
$75K+
-Remove Existing Tub & Shower.
-Install Tiled Shower Walls and Pan
-Porcelain or Natural Stone Flooring & Shower
-Custom Vanity Cabinetry
-Tier #3 Plumbing Fixtures
-Tier #3 Quartz/Granite Countertops
-Frameless Shower Door
-Fixtures May Be Relocated
What's Included in Cost
- Labor, Materials, Flooring, Cabinets, Countertops, Paint and Fixtures.
What's Not Included in Cost
- Permits, Code Required Upgrades.
Lone Shower upgrade
Entry Level
$25K+
-Remove Existing Tub & Shower
-Install Fiberglass or Acrylic Shower Pan and Walls.
-Tier #1 Plumbing Fixtures
-No Shower Door
-Same Fixture Locations
-Minimal Drywall and Paint Touch-up.
Mid Level
$32K+
-Remove Existing Tub & Shower.
-Install Cultured Stone Shower Pan and Walls.
-Tier #2 Plumbing Fixtures
-Framed Shower Door
-Same Fixture Location
-Minimal Drywall and Paint-Touch-up.
Upper Level
$39K+
-Remove Existing Tub & Shower.
-Install Tiled Shower Walls and Pan
-Tier #3 Plumbing Fixtures
-Frameless Shower Door
-Fixtures May Be Relocated
-Minimal Drywall and Paint Touch-up.
What's Included in Cost
- Labor, Materials, Tile, & Fixtures.
What's Not Included in Cost
- Permits, Code Required Upgrades, Flooring, Counters, Cabinetry, Painting or Staining, Decorative Light Fixtures.